Contact
Contact Us
Send the load schedule and the site conditions. You will get a rating back, not a brochure.
The fastest way to a useful answer is a load schedule: connected kW, the largest motor and how it starts, the share of variable-speed drive or UPS load, the duty class, and the site altitude and ambient temperature.
If you already know the model, send the quantity, the voltage and frequency, the destination port and whether you need a transfer switch panel with it.
-
Address
Unit 9, Power Systems Assembly Park
[Client to confirm street, district, city and postcode] - Telephone +86 21 5000 8600
- Email sales@powercore.example
- Office hours Mon – Fri, 08:30 – 18:00 (GMT+8)
Send an enquiry
Include the load schedule and the site conditions. The reply comes from the engineer who sizes the set.