Quality & Testing

Traceable steel, loaded test runs and documentation crews can actually use.

Every module that leaves our floor has already run — loaded, at speed, for hours. This page summarises how that promise is kept.

Materials and fabrication

Frames are laser-cut and welded from traceable steel, then powder-coated in-house. Rollers, belts and chain come from audited suppliers and are batch-checked on arrival.

Loaded test runs

Assembled modules run on the test floor with representative product at rated speed and load. Drives are checked for current draw and temperature; sensors and diverts cycle through their full logic before anything is packed.

Documentation

  • Test-run report per serial number.
  • Layout and interface drawings for the installing crew.
  • Wiring diagrams and I/O lists.
  • Commissioning checklist and spare parts book.

After the handover

Commissioning data stays on file. When a line changes product or rate years later, we re-check the maths against the original design instead of guessing.