Mon–Fri 8:00–17:30

Conveying & sorting systems

Every line runs loaded at rated speed before it ships, tracking within ±2 mm across the full belt width.

Belt, roller, chain and spiral sections bolt onto the drives and controls you already run, sized from your rate before the first frame is cut.

Years moving goods
25+
Sort rates delivered
9,000/h
Export markets
60+
Conveyor lines crossing a modern sorting center Live floor · cross-belt sort line

Belt widths we build to, mm

Ø89 mm roller, shaft & end-bearing hub
2,200 mm Widest belt we build to spec
42° sorting-chute diverter, gate open

Sized From Your Rate

Every line starts from peak throughput, not a catalog page.

Modular By Design

Straights, curves, merges and spirals share parts and connect cleanly.

Global Delivery

Export packing, documents and installation supervision worldwide.

Lifetime Support

Commissioning data on file, spares and retrofits for the line's life.

How we work

What happens between your first sketch and first shift

Four steps, the same engineer end to end.

  1. Send your flow

    What you move, the rate at peak and a sketch of the space.

  2. Engineering review

    We size speeds, gaps and merges, and quote with a layout drawing.

  3. Build & test run

    Fabrication, assembly and loaded test runs with reports per serial.

  4. Deliver & commission

    Export packing, installation supervision and ramp-up support.

Built as modules, not miles of loose parts

Fabrication

Built as modules, not miles of loose parts

Frames are laser-cut, welded and powder-coated in-house, then assembled into plug-and-play sections with drives and sensors fitted. Site crews bolt sections together instead of building conveyors from crates.

Our quality process

References

Heard from warehouse and plant floors

Their engineer resized our merge before quoting — the line hit peak-day rate from week one instead of after a retrofit.
Elena V. Fulfillment director
Sections arrived pre-wired with the I/O list matching the drawings. Our integrator had the loop sorting in days, not weeks.
Priya N. Controls integrator
The spiral replaced two lifts we were always repairing. It has simply run — three shifts, eighteen months, one greasing.
Tomas H. Maintenance manager
Every module runs loaded before it ships

Proof, not promises

Every module runs loaded before it ships

Assembled sections run with representative product at rated speed on our test floor. Drives are checked for draw and temperature, diverts cycle their full logic, and the test report ships with the serial number.

Request a quote

Insights

Written between layout reviews and startups

Layout guides, throughput math and maintenance notes.

Send your flow, get a sized proposal within a day.

Tell us what you move, your peak rate and the footprint you have on the floor. We size drives, spacing and merges, then send a layout drawing back within one business day.

Start your inquiry
WhatsAppEmailCall us