Aquilo Thermal Systems
Request a Quote
Send the package, the power and the water. An engineer replies with an assessment.
What to include
The more of this you can give us, the more useful the first reply will be. None of it is mandatory.
- Accelerator or CPU package, and how many per node
- Sustained and peak power per package
- Facility supply water temperature, including the seasonal worst case
- Available flow and pressure at the rack
- Number of racks and the deployment timeline
- Whether this is a new build or a retrofit into a live room
What happens next
An engineer reads it, not a mailbox rule. You get a thermal assessment with the assumptions written down, and a quotation once the assumptions are agreed. If we think liquid cooling is the wrong answer for your load, we will tell you that instead.