Skip to content
  1. Home
  2. Engineering Notes
  3. Choosing the right brewhouse size for your brewery
August 6, 2026 Process Engineering 2 min read

Choosing the right brewhouse size for your brewery

Most breweries pick a brewhouse by looking at what they can afford. Here is a simpler way to think about it: start from the beer you plan to sell, and work backwards.

CV-1000 Three-Vessel Brewhouse — stainless steel brewing equipment

“What size brewhouse do I need?” is the question every new brewery asks first. The honest answer is that the equipment should be the last thing you choose. Start with how much beer you actually plan to sell, and the right size falls out naturally.

Start with the beer, not the machine

Think about how much beer you realistically expect to sell in a year — not the dream figure, but the one you would be comfortable putting in a business plan. Then think about how often you want to brew. Some breweries brew every day; others brew twice a week and spend the rest of the time selling. Both are valid, and they lead to very different equipment.

Once you know roughly how much beer you need per week, the size of each batch follows from simple division. A little spare capacity is sensible, because no brewery runs exactly to plan.

The tanks matter as much as the brewhouse

A common surprise for new brewers: the brewhouse is only half the story. Beer spends a day being brewed and then two to three weeks fermenting and conditioning, so the fermentation tanks are usually what limits how much you can make.

A brewhouse that produces more than your tanks can hold just sits idle. Balancing the two — so the brewing side and the fermenting side finish the week together — is what good plant design is really about.

Bigger is not automatically better

It is tempting to buy the biggest system the budget allows and “grow into it”. In practice, brewing small batches on oversized equipment works poorly: the vessels are the wrong shape for the volume and the beer suffers. It is almost always better to buy the size you need now and plan the layout so more tanks can be added later.

Common mistakes to avoid

Sizing for your best month. Demand goes up and down through the year. Size for the average and let your tanks and stock smooth out the peaks.

Forgetting the space around the equipment. Vessels need room for cleaning, maintenance and moving materials. A floor plan that looks full on paper will feel impossible in real life.

Ignoring the utilities. Power, water and drainage requirements grow with the plant. Checking them early is far cheaper than upgrading them later.

Talk it through with us

If you would like to walk through this thinking with your own numbers, send us your target annual volume. A short conversation is usually enough to tell whether the system you have in mind matches the amount of beer you have in mind.

Talk to an engineer

Planning a plant of your own?

Send us your target volume and floor plan and we will come back with a sized layout, a utility schedule and a firm quotation.