Refrigerated or Desiccant: Choosing the Right Dryer
Where the pipe runs — and what the air touches — answers the dryer question.
Compressors, dryers & air treatment
Free air delivery, specific power and noise are measured against ISO 1217 on every package before it leaves the plant.
Assembly
Airends are run-in before they meet a package. Coolers, separators and controls are assembled to torque-controlled procedures, and every connection is leak-checked under pressure before paint.
Our quality processHow we work
The same application engineer stays on the project from quote to commissioning.
Air demand, pressure and running hours — a sketch of the plant room helps.
We size the system, check the treatment chain and quote with layouts.
Assembly, run-in and a performance test against the data sheet.
Export packing, start-up supervision and operator training.
Engineered picks
The units our application engineers specify most.
Certified vertical receivers that stabilise pressure and drop compressor cycling.
View & InquireA +3 °C pressure dew point that stops rust, water hammer and paint craters.
View & InquireRoad-towable diesel air for drilling, blasting and every site without a socket.
View & InquireISO 8573-1 Class 0 air from a scroll airend — quiet enough for the…
View & InquireCompressor, receiver and optional dryer on one skid — air in a single delivery.
View & InquireThe plant-room workhorse: direct-driven screw air for three-shift duty.
View & InquireDemand profiling, plant-room layout and pipe sizing on every project.
Every package measured for flow, power and dew point against ISO 1217.
Export packing, certified vessels and commissioning support worldwide.
Service plans, genuine elements and energy audits for the plant's life.
References
Their logger showed our real demand was half what the old compressor was sized for. The VSD unit they quoted cut the air bill by a third.
Treatment skid arrived piped and tested — my electricians had dry air running the same afternoon it landed.
They retrofitted VSD control to our ten-year-old screw and serviced two other brands on the same visit. One supplier, whole plant room.
Proof, not promises
Free air delivery, specific power and noise are measured on our test bench against ISO 1217. The report ships with the machine — auditors love us for it.
Request a quoteSend air demand, pressure and running hours today — a sized proposal with a plant-room layout comes back within one business day.

Scan with WeChat to start a chat.
Please share your requirements, quantity and application details. We will reply promptly.