Runnability & Testing

Pilot-line runnability testing against a written protocol.

Brochures are easy to print. This page summarises how a Fibreline section earns its specification before the first unit reaches a mill.

Proven on the pilot line

New section designs run on our pilot paper machine across furnishes, basis weights and speeds — recycled and virgin stock, light and heavy grades, crawl to design speed. Settings that hold the sheet through real stock variation become the delivered defaults; ideas that only work with perfect stock do not ship.

A protocol, not a demonstration

Each machine section passes a written verification protocol: structural checks on frames and loading arms, drive and vibration verification at speed, hydraulic and vacuum system testing, guarding review against the machine safety file, and an open-issues list that must close before release.

What every unit passes

  • Weld and frame inspection at defined checkpoints during fabrication.
  • Roll balance verification at running speed, documented per roll.
  • Function run of every moving assembly before dispatch.
  • Hydraulic and vacuum circuits pressure-tested and verified tight.
  • Guarding and safety decal audit against the machine safety file.

Documented and traceable

Every section leaves with its inspection record, settings sheet and serial-numbered parts book. Records stay retrievable by serial number for the machine’s working life. Ask for a sample inspection record with your inquiry.