Clearflow RO-SW 450
Seawater RO train with isobaric energy recovery for coastal potable and process supply.
- 45 m³/hPermeate
- 99.75 %Rejection
- 45 %Recovery
- 2.62 kWh/m³Specific energy
Full seawater desalination hall — six parallel banks with isobaric energy recovery.
Our largest standard configuration. Six parallel banks share a common CIP, a common permeate header and a redundant control system, so any one bank can be isolated without dropping the plant below half output.
The Clearflow RO-SW 2000 is a standard Clearflow configuration rated at 200 m³/h of permeate at 45 % system recovery, which is 4,800 m³ over a continuous day. The published envelope assumes 25 °C, a clean membrane and the design feed analysis; every project is re-projected against the water you actually have before a price is issued.
The array is arranged as 6 parallel banks, each 11 vessels × 6 elements, single stage. Element type is SW 8040 high-flow, 37.2 m² each, running on high-rejection seawater polyamide with boron-selective second pass option. Design flux is held at 13.6 LMH so the concentrate velocity through the last element stays inside the manufacturer envelope at design recovery — the single most reliable predictor of how long the membranes will last.
| Parameter | Design value | Note |
|---|---|---|
| Feed pressure | 61.5 bar | At design feed TDS and 25 °C |
| Trans-membrane differential | 2.90 bar | Clean; change-out trigger at twice this value |
| Feed temperature | 8–40 °C | Output falls roughly 3 % per °C below 25 °C |
| Continuous pH | 3.0–10.0 | Wider band tolerated during cleaning |
| Free chlorine | Max 0.10 mg/L | Continuous exposure limit at the membrane face |
| Concentrate flow | 244.4 m³/h | At design recovery |
Centralised four-stage CIP, 20,000 L. Control is by Redundant PLC pair with plant SCADA and historian. The wetted specification is Super duplex 2507 high-pressure piping, GRP intake headers. Pressurisation is by 6 × API 610 BB2 barrel pumps with variable frequency drives; PX isobaric pressure exchanger array, 95 % transfer efficiency.
| Permeate capacity | 200 m³/h |
|---|---|
| Daily output at 24 h | 4,800 m³/d |
| System recovery | 45 % |
| Design feed flow | 444.4 m³/h |
| Concentrate flow | 244.4 m³/h |
| Nominal rejection | 99.78 % |
|---|---|
| Typical permeate TDS | 131.5 mg/L |
| Design flux | 13.6 LMH |
| Feed pressure | 61.5 bar |
| Trans-membrane ΔP | 2.90 bar |
| Specific energy | 2.58 kWh/m³ |
| Max feed TDS | 45,000 mg/L |
|---|---|
| Min design feed TDS | 20,000 mg/L |
| Max feed SDI15 | 4.0 |
| Max feed turbidity | 0.20 NTU |
| Min feed temperature | 8 °C |
| Max feed temperature | 40 °C |
| Min continuous pH | 3.0 |
| Max continuous pH | 10.0 |
| Max free chlorine | 0.10 mg/L |
| Membrane elements | 396 pcs |
|---|---|
| Pressure vessels | 66 pcs |
| Elements per vessel | 6 pcs |
| Stage 1 vessels | 11 pcs |
| Stage 2 vessels | 0 pcs |
| Array configuration | 6 parallel banks, each 11 vessels × 6 elements, single stage |
| Element type | SW 8040 high-flow, 37.2 m² each |
| Membrane chemistry | High-rejection seawater polyamide with boron-selective second pass option |
| Active membrane area | 14,731 m² |
| Pressure pump | 6 × API 610 BB2 barrel pumps with variable frequency drives |
|---|---|
| Energy recovery | PX isobaric pressure exchanger array, 95 % transfer efficiency |
| Wetted materials | Super duplex 2507 high-pressure piping, GRP intake headers |
| Control system | Redundant PLC pair with plant SCADA and historian |
| Cleaning regime | Centralised four-stage CIP, 20,000 L |
| Skid footprint L×W×H | 34.0 × 12.5 × 6.0 m process hall |
| Dry shipping weight | 92,000 kg |
| Installed motor load | 640 kW |
| Indicative lead time | 34–40 weeks ex works |
Send us the feed analysis and duty flow and we will re-project this array against your water.
Seawater RO train with isobaric energy recovery for coastal potable and process supply.
Send us the duty flow, the feed water analysis and the permeate specification you have to hit. Our process desk replies within one working day.