Reverse osmosis
Brackish and seawater trains from 2 to 200 m³/h, tapered two-stage arrays, isobaric energy recovery on high-salinity duties.
Reverse osmosis, ultrafiltration, nanofiltration and EDI trains built to order — from 2 m³/h polishing skids to 200 m³/h seawater desalination halls. Every train is projected, witness-tested and delivered with its own performance envelope.
Each train is projected in-house against your feed analysis before a single vessel is cut. We do not resell a catalogue — we size the array, pick the element and stand behind the permeate number.
Brackish and seawater trains from 2 to 200 m³/h, tapered two-stage arrays, isobaric energy recovery on high-salinity duties.
Outside-in PVDF hollow fibre on fixed-flux control. The stage that decides whether the RO downstream reaches its warranty life.
Selective softening and colour removal where full demineralisation would be an expensive over-treatment.
Continuous chemical-free polishing to 18.2 MΩ·cm for microelectronics, pharmaceutical and power station duties.
MBR and tertiary RO trains that take a treated effluent back to process-grade water instead of to the outfall.
Full desalination halls with pressure-exchanger energy recovery, boron control and remineralisation.
One team carries your project from the first enquiry to years of reliable operation — nothing is handed off, and nothing gets lost between departments.
Every system starts from what you actually need — your water, your duty, your site — not from a fixed catalogue configuration.
Each unit is assembled and fully tested in our own workshop, so commissioning on site holds no surprises.
Operator training, spare parts and engineering support from the same people who designed the system.
Every model below is a real starting configuration with a published envelope. The array is then re-projected for your water.
Two-stage brackish RO skid for boiler make-up and general process duty.
Tapered two-stage brackish RO rack for continuous demineralised water supply.
Seawater RO train with isobaric energy recovery for coastal potable and process supply.
Full seawater desalination hall — six parallel banks with isobaric energy recovery.
Compact hollow-fibre UF skid delivering SDI15 below 3 to a downstream RO train.
Outside-in PVDF ultrafiltration rack on fixed-flux control for high-turbidity feeds.
Tell us your requirement and our engineers will come back with a recommended configuration, a budget figure and honest advice on the options.
RO plus EDI trains feeding subcritical and supercritical boilers to a silica-limited spec.
Sanitary 316L skids, orbital-welded distribution and full IQ/OQ documentation packages.
MBR followed by tertiary RO returning treated effluent to cooling and irrigation duty.
Pressure-exchanger trains with boron control and calcite remineralisation for potable supply.
A membrane plant is only as good as the assumptions behind its projection. Clearflow runs every enquiry through a full ionic balance, a scaling index check and — where the water is unusual — a bench-scale crossflow trial on the actual sample before a price is issued.
Four gates, each with a document you actually receive — not a milestone chart you never see again.
You send a full analysis and a duty. We return a charge-balanced review, the scaling risks and the recovery ceiling your water will physically support.
A projected array with element-by-element flux, a specific-energy figure, a P&ID and a priced scope. Two working days on standard duties.
Skid built in our assembly bay, wetted parts certified, then a witnessed clean-water factory acceptance test against the projection.
Site installation supervision, membrane wet-up, performance verification at contract conditions, then a normalised performance monitoring plan.
The standard on-site water test is fast, cheap and used everywhere — and it misses some of the most troublesome material in…
Read the note →Raw flow and pressure readings can hide a developing problem for months. Three corrected values, checked a few minutes a day, catch…
Read the note →Keeping more of your feed water sounds like pure gain, but past a certain point it costs more than it saves. A…
Read the note →Give us a TDS profile, a target permeate spec and a duty flow. Our process desk returns a projected array, a specific-energy figure and a budget envelope — normally inside two working days.
Duty flow, feed water analysis and the permeate specification you have to hit. Attach the analysis if you have one.
Send us the duty flow, the feed water analysis and the permeate specification you have to hit. Our process desk replies within one working day.