Fernhill Secondary Expansion
Education · 68 units · 14 weeks on site · Tacoma, WA
Twenty-four teaching spaces, a hall and a staff block added to a school that stayed open throughout. Foundations went in over the spring half-term; the units were set across six summer weeks with every lift booked outside school hours. The school opened in September with no decant and no temporary accommodation cost.
- MS-E28 Classroom Module × 48, MS-E40 Double Classroom × 12, MS-M18 Meeting Cell × 8
- Programme measured against a like-for-like in-situ tender: 26 weeks saved
- Zero site accidents across 412 crane lifts
Kiln Road Apartments
Residential · 112 units · 8 storeys · Portland, OR
Eight storeys of stacked volumetric homes over a concrete transfer podium. The MS-R30 carries the load through its own corner posts to the sixth floor, with heavy posts introduced below that. Practical completion came 31 weeks after groundbreak.
- MS-R30 Apartment Unit × 76, MS-R18 Studio Apartment × 36
- 14 units set per crane shift at peak
- 67% fewer vehicle movements than the in-situ baseline
Northgate Diagnostic Annex
Healthcare · 24 units · 9 weeks on site · Seattle, WA
Imaging and consulting suites built alongside a fully operational hospital. Every MS-H34 travelled at night under escort and was set before the day shift arrived; the department never closed. Radiation shielding was certified in the plant and re-verified once in position.
- MS-H34 Diagnostic Unit × 6, MS-H26 Consulting Suite × 18
- Night-time setting, zero daytime road closures
- All clinical commissioning evidence handed over as a single file
Halden Works Studios
Workplace · 40 units · 3 storeys · Anchorage, AK
Forty studio units for a creative tenancy on a constrained industrial plot, specified with the Arctic envelope package at 0.11 W/m²K. Fitted out in the plant down to the door furniture, then shipped 3,400 km by road and barge.
- MS-S24 Studio Unit × 28, MS-O32 Office Pod × 12
- Arctic package: 340 mm envelope, triple glazing, thermally broken corner posts
- Winter installation at −18 °C with no wet trades on site