Mon–Fri 8:00–17:30
Wide view of a modern packaging machinery production line hall with connected stainless machines

Packaging machinery

A 320 mm film reel becomes a sealed twelve-pack, hands-free.

Flow wrapping through palletizing, machined at our Millrace works and proved on your film before FAT sign-off.

Line rate held through the full FAT run
160 packs/min
Mean tool-free changeover, three film widths
14 min
Witnessed acceptance run before dispatch
60 h

References

Notes from the lines we have commissioned

The FAT ran with our film and our cartons at the contract rate. Commissioning on our floor matched the protocol to the minute.
Marta K. Plant engineering manager
Changeover between our three formats takes one operator and no tools. The stored recipes actually restore — that was new for us.
Daniel R. Production supervisor
When a sensor failed at month nine, remote diagnostics named the part before our electrician reached the panel. The spare was already boxed.
Ines B. Maintenance lead

Engineered to Product

Machines tuned to your samples and materials, not to an ideal catalogue case.

Tested at Rate

Every machine passes a witnessed acceptance run before it ships.

Fast Changeover

Stored recipes and tool-free format parts keep downtime short.

Long-Term Support

Installation, training, remote diagnostics and spares from stock.

Frame machining, panel wiring and cell assembly happen in the same hall

Manufacturing

Frame machining, panel wiring and cell assembly happen in the same hall

Frame fabrication, machining and electrical assembly run in dedicated cells with in-process checks at every station, so tolerance drift shows up before final assembly, not after.

Our acceptance testing

How we work

Four stages between sample and first pallet

Each stage closes out in writing before the next one starts.

  1. Send product & targets

    Samples, throughput target and floor plan — one email starts it.

  2. Engineering review

    We size the machines, layout and buffers, and quote with drawings.

  3. Build & acceptance test

    Built in-house, then run with your product against a signed FAT protocol.

  4. Install & support

    Commissioning, operator training, remote diagnostics and spares.

Every machine runs your product before it ships

Proof, not promises

Every machine runs your product before it ships

Acceptance tests run at contract rate with your film, cartons and containers — witnessed on site or by video, signed against a written protocol, and delivered with the machine.

Request a quote

Insights

Written between FAT runs and floor walks

Layout planning, changeover practice and material notes from our engineers.

Send your product — we will size the line

Tell us the product, the target rate and the floor space. We size the machines and send drawings within one business day.

Start your inquiry
WhatsAppEmailCall us