The Carts and Chairs Are What Kill Your Module Electronics
Protected-area discipline, grounding what moves, ionisation and measured audits.
Granite Falls works · assembly hall 2
Stations are welded and wired in the Granite Falls hall, then run at production takt in the commissioning bay next door for 96 h before anything is crated. FAT is witnessed here with your cells, SAT on your floor, and our engineers stay through operator training.
Fixtures are cut to the can dimensions and tab geometry on your print, not to a catalogue format.
Every station runs 96 h at takt in the commissioning bay, with the open-issue list closed on paper.
Force, energy and angle land in the log under the module ID, ready for a warranty question three years out.
Sonotrodes, probes and anvils are catalogue parts with published change intervals.
Off the floor
Eight builds currently repeating across module and pack projects.
A six-axis arm traces the gap-filler path while the meter-mix unit holds ratio and…
View & InquireIndependent channels run each cell on its own charge profile, and tray contacts are…
View & InquireLid clamp and pressure-decay test head share one carrier, so the housing is never…
View & InquireThe servo fixture takes the weight of the module into the housing; the operator…
View & InquireOne fixture closure contacts every test point, then voltage, insulation and BMS communication run…
View & InquireFibre laser on a galvo head joins nickel tabs to busbar inside a laser-safe…
View & InquireA vacuum-and-clamp end effector seats prismatic cans against ground datums while side pressure builds…
View & InquireA rotary bowl feeds cans past gold-plated probes; OCV and ACIR decide which of…
View & InquireMilestones
Each milestone carries a date on the order confirmation.
Can or pouch dimensions, tab geometry, module print and the parts per minute the station has to hold.
Gripper reach, datum scheme, weld schedule and probe layout come back as a drawing set with the price.
Welded, wired, then run at takt in the commissioning bay until the issue list is empty.
Placement, utility checks, alignment, operator training and an engineer on the floor through the first shift.
Line map
Nine families, listed in the order a cell meets them.
Shop floor
The welder arrived with our joint recipes loaded and the acceptance record in the crate. First shift, first modules, no surprises.
A probe fixture wore mid-quarter and the replacement was on a flight with the drawings updated. That is what support means on a running line.
Our own technicians service every Voltform station with the plant's standard tools. Nothing needs a vendor laptop on site.
Assembly hall
Frames are welded and stress-relieved in bay 1, fixture plates ground and pinned in bay 2, cabinets wired and point-to-point checked in bay 3. Nothing waits on a subcontractor drawing revision.
Safety & testing
Acceptance
The bay runs your cells where the project allows, at the takt the order confirmation states. Whatever recipe passes FAT ships as the delivered default, and the same numbered issue list carries into SAT.
Request a quoteCan dimensions, tab geometry, module print and parts per minute. A station list with fixture scope and a price comes back inside one business day.

Scan with WeChat to start a chat.
Please share your cell format, module design and takt target. We will reply promptly.