EV-03
Mining & Quarry
Earthwork & Stockpile Volumetrics
Cut, fill and stock quantities against a design surface or a prior epoch, back inside 48 hours.
- Ground sampling
- 2.47 cm/px
- Horizontal RMSE
- 2.5 cm
Volume, face and haul-road survey on live extraction sites, flown around the shift pattern.
EV-03
Mining & Quarry
Cut, fill and stock quantities against a design surface or a prior epoch, back inside 48 hours.
MQ-04
Mining & Quarry
Bench geometry, face position and haul road condition on a live pit, flown around the shift.
Start a project
Share an area of interest, the accuracy you need and the format your engineers work in. You get a mission plan, a control scheme, a fixed price and a delivery date — usually within one working day.
Tell us the site, the tolerance and the delivery format. A surveyor replies with a flight plan and a fixed price.