AB-06
Civil & Construction
As-Built Construction Scanning
Sub-centimetre verification of what was actually built, against what was actually drawn.
- Ground sampling
- 0.63 cm/px
- Horizontal RMSE
- 1.2 cm
Design-grade capture for earthworks, structures and as-built verification, tied to the project control network.
AB-06
Civil & Construction
Sub-centimetre verification of what was actually built, against what was actually drawn.
OM-07
Civil & Construction
Radiometrically balanced, properly orthorectified imagery you can measure on, not just look at.
BS-11
Civil & Construction
Millimetre-scale imagery of deck, pier and soffit geometry without a closure or a rope team.
GC-12
Civil & Construction
Target networks, checkpoint observation and independent validation of somebody else's survey.
Start a project
Share an area of interest, the accuracy you need and the format your engineers work in. You get a mission plan, a control scheme, a fixed price and a delivery date — usually within one working day.
Tell us the site, the tolerance and the delivery format. A surveyor replies with a flight plan and a fixed price.